146day

News Center

联系方式

Reservation booth:+86(0)21-3114 8748
Visit/media contact:+8613601815988
QQ:2463282767
email:artsexpo@sgexpo.cn

News

The first train of the extension line of Nanchang Metro Line 1 and 2 was unveiled

发布时间:2024-07-01 14:58:33  
0

Good news!

On the morning of June 28
The first train of Nanchang Metro Line 1 and 2 extension line
Arrived without a hitch
Nanchang Metro Line 2 Shengmi South Vehicle Comprehensive Maintenance Base
And complete the pick-up work
This marks the preparatory work for the operation of the No. 1 and No. 2 extension lines of the Nanchang Metro
Officially from the preparatory stage to the substantive stage

1-240F1161Qa32.jpg


 Scene map
It is understood
A total of 52 trains were procured for the extension line
All of them are 6-car aluminum alloy B2 electric buses
THE MAXIMUM SPEED IS 80KM/H
The maximum passenger capacity of a single train is 2062
The configuration refers to the current rail transit industry in China
Up-to-date technical information

1-240F1161SDM.jpg


1-240F1161U2Q7.jpg

新列车图


太棒了!

那新到的延长线列车

与此前1、2号线使用的列车相比

有什么不同?

做了哪些方面的改进呢?

和小铁一起来看看吧!

一、列车运行更节能环保

南昌地铁1、2号线延长线列车继续推广应用永磁电机,可提高电能利用率,并且首次装备了高频化辅助逆变器及无油空压机,不仅在运行过程中避免了油污的产生与排放,有利于保护环境,实现绿色出行,更在一定程度上减少了机械的摩擦和振动,进一步保障了地铁列车运行的平稳与安全。同时,搭载高频化辅助逆变器的单辆列车可减重200KG,效率将实现2%以上提升


1-240F1150021237.jpg
▲ Scene map



Second, the riding experience is more comfortable and safer

In order to more clearly display time, station information, operation information and other information to passengers, the carriages of the extension line train are equipped with a 21.5-inch LCD TV screen with larger size and higher image quality. In addition, all trains on the extension line are equipped with air purification devices, which can actively purify, sanitize and decompose PM2.5, TVOC, viruses and bacteria, formaldehyde, benzene, etc., creating a safe, fresh and comfortable travel environment for passengers on the basis of ensuring environmental protection.


3. More intelligent and efficient maintenance

In order to further improve the intelligent service level of metro trains, the extension trains of Line 1 and Line 2 use the industry-leading online monitoring system of LCU, pantograph and running department, which can realize real-time monitoring of train operation data and fault information, laying a solid foundation for further building a health management system that comprehensively supports the whole life cycle of vehicles.


Image


After receiving the first train of Nanchang Metro Line 1 and 2 extension line

Commissioning and acceptance work will begin

The arrival of this train means:

Preparations for the operation of the extension line officially kicked off


Subsequent

The extension of Line 1 will also reach 20 trains

The extension of Line 2 will also have 12 trains

By the end of the year there will be 33 trains

After all 33 trains arrived at the section

We will officially open the extension line for next year

Make systematic and thorough preparations

Make sure our vehicles

Meet the needs of operation and maintenance and national standards

Lay a solid foundation for the official launch next year

Let's look forward to it together~

Nanchang Metro, walk with you all the way!
相关推荐:轨道交通展展位预订轨道交通展免费报名参观